The new permanent 32mm layout at the Westbury site


The Track Itself

The track itself is by Peco (who else?) and appearances can be deceptive. Although it is to the O Gauge track width, the spacing of the sleepers would be far too great for mainline practice. This is because the model track is intended to represent the 2-foot gauge prototype.


The Base Boards

Some thought was given to covering the boards with roofing felt, but we thought that that would only introduce another maintenance headache when the felt had to be pierced by the track fixings, leaving us with uncertainties as to what would be happening to the boards underneath. In the end we went for marine ply, liberally coated with that stuff which is reputed to do exactly what it says on the tin.


The Foundations

The supports are plastic drain pipes, set into concrete bases, and then filled with concrete to make them rugged. It would be a "phallusy" to interpret the chimney of the Cement Works in the background as anything else.


The Magnificence of the Welshpool & Llanfair

Sometimes the best extra comment is no further comment!